Is there a 1:1 relationship between lookahead and the onset of gain reduction?
If, for example, I set lookahead to its maximum value of 5 ms, does that mean gain reduction would always begin 5 ms in advance of the peak crossing the threshold?
Hi Bitflipper,
In short: yes! :-)
Please fix the following errors:
Is there a 1:1 relationship between lookahead and the onset of gain reduction?
If, for example, I set lookahead to its maximum value of 5 ms, does that mean gain reduction would always begin 5 ms in advance of the peak crossing the threshold?